CURRENT STATUS

Prepared for Plastering and Painting!

With framing now finished on multiple homes, roofing, windows, and sliding doors have been installed, and exterior cladding is progressing steadily. Internally, pre-wiring, insulation, and plumbing are in motion, and interior linings are being fitted. Plastering and painting will follow shortly as the first lot of homes move toward completion.

Check in below for updated photos and information!

 
 

Lot 1  

Lot 2  

Lot 3  

Lot 4  

Lot 5  

Lot 1.

Available


Exterior Work Underway! 
Framing is complete, and the roof, windows, and sliding doors are installed. Exterior cladding is now underway. 

Enquire Now

Lot 2.

Available


Interior Work Underway!
Now that the home is weathertight and exterior cladding is in progress, interior work has begun. Pre-wiring, insulation, and plumbing are in progress, with walls soon to be lined and plastering to follow.

Enquire Now

Lot 3.

Available


Interior Work Underway!
Now that the home is weathertight and exterior cladding is in progress, interior work has begun. Pre-wiring, insulation, and plumbing are in progress, with walls soon to be lined and plastering to follow.

Enquire Now

Lot 4.

Available


Ready for Paint!
The interior is now plastered and prepped for a fresh coat of paint.

Enquire Now

Lot 5.

Available


Ready for Paint!
The interior is now plastered and prepped for a fresh coat of paint.